The south helix has been installed into the layout. Much to my relief it fit pretty good. My one oops was the buss wiring routing along the backdrop wall. Fortunately, a little rerouting on the backside of the wall freed up enough slack to arch the wires over the helix. With that one exception I […]
Read the rest of this entry »