Connectors 1, 2, & 3

Written By: Alan - May• 23•15

The first three moduleconnect 123 connectors have been constructed and installed. With these in place Brittain Yard is complete. Woohoo! For the first time I can run a train the complete length of the yard. It is very cool. This is also the first time I have the opportunity to walk along with a train. Prior to today it was just test running back and forth on one module.

Connector #1

100_7474

Connector #2

100_7475

Connector #3

100_7476

View of the yard looking east from end of Spur 4

100_7477

View of the yard looking west

100_7483

As you can see they are wired for easy removal if needed. Typically the control and accessory buses do not cross a connector. The exception so far is this connector on spur 4. The helix will sit in the center and I don’t want buses to crisscross the helix so bridging the connector with the control and accessory buses was necessary in this spot.

100_7495

This is a more typical connector underside – track buses only. The yard is divided into two power districts (east and west). The division occurs on this connector. So, there are three buses – yard east, yard west, main.

100_7491

I must admit I have spent a fair bit of time running a train around in the yard. It’s a blast! And very satisfying in that the yard trackwork performs well. Operating the switches with no control panels is a drag. I have to search through the wire tags to find the right wire to energize to throw a switch. Oh well, all in due time.

As a little side note… I received from the MadeInChina company my emergency stop switches. These will be on the control panels. If ever something goes whacky on the railroad simply push the big red button and the entire railroad will shut down. More on these when the time comes.

100_7247a

With Brittain Yard complete, I move further down the line. Next module – rubber factories switching area. Enjoying every minute!

Share

You can follow any responses to this entry through the RSS 2.0 feed. You can skip to the end and leave a response. Pinging is currently not allowed.

5 Comments

  1. Rob Dove says:

    Alan your layout is looking great! Glad you finally got to run some trains on your track for testing purposes and to find out how long your control system lasts between charges.

    Great to see your progress to this point.

  2. Adrian Marti says:

    Hi Alan

    thanks for posting again. Your updates are always very informative and give many ideas while starting to build my own layout.

    Keep the trains running!
    Adrian

  3. Joe Daddy says:

    Alan,
    I like what I see, you are indeed a talented guy. Thanks for sharing your work.

    Joe

  4. Scott Whittingham says:

    Hello Alan,

    The layout is coming along well, love the wiring info. Was wondering if you could post the website address for that MadeInChina Company – I would like to check it out.

  5. alan says:

    Scott,

    The MadeInChina company is a tongue-in-cheek reference to anything coming from China. A friend of mine once quipped that the MadeInChina [ma-naudin-cheena] company seems to make everything. The name stuck.

    The switches were purchased on eBay.
    http://www.ebay.com/itm/10pcs-Red-Mushroom-Cap-1NO-1NC-DPST-Emergency-Stop-Push-Button-Switch-AC660V-10A-/370820458028?pt=LH_DefaultDomain_0&hash=item56569f262c

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.