Climbing Out of the Potomac River Valley

Written By: Alan - Oct• 09•13

Securing sub-roadbed on risers continues with the grade from zero elevation (53″) down into the Potomac River valley through Kitzmiller. The final track elevation at Kitzmiller where the track enters the tunnel is 46″, lowest right-of-way point on the railroad. The distance from where the track exits the backdrop at the far end of Mettiki mine to where it enters the tunnel at Kitzmiller is roughly 38′. A total of 7″ rise (53-46) in a run of 456″ (38*12) = 1.535% grade (rise/run*100). Easy enough, right? Not so fast. Real railroads use something called curve compensated grades. The idea being it is harder to pull a train around a curve on a grade than it is to pull the same train up a grade of straight track. I am sure the railroads have calculations for exactly what the grade should be for any given curve/grade ratio. I did not get so precise. I simply wanted my curves to be less grade than the straight track on the hill.

First, I shimmed temporary spacers under the sub-roadbed for the entire length of the run trying to make the grade appear by eye to be uniform. With the help of a a nifty little app for my phone called Bubble Level by Wen Studio I was able to refine the shimming until the grade was uniform all the way down the hill. Next came the grade compensation. There were three areas of concern:

  1. The run past the mine
  2. The big curve around the peninsula end
  3. The curve in Kitzmiller entering the tunnel.

I did not want the mainline to be on a steep incline as it passed the mine area just for aesthetic reasons. The big curve around the peninsula is long enough that quite a bit of train length would be on a curve at the same time. Finally, the curve in Kitzmiller is a relatively tight radius compared to other curves on the main.

Under each of the three areas of concern I removed shims to lessen the grade somewhat. The plywood the sub-roadbed is made from is quite rigid so clamps were needed to force the plywood to follow the grade changes. With some shims removed in the three target areas naturally the grade had to increase in the stretches between them. Through a long process of trial and err I moved shims about until the desired grades were achieved. Just as a nice finishing touch, and the fact the iPhone app was sufficiently granular to allow doing so, I shimmed vertical transitions into the grades. This rounds off the grade changes so there are no “roof peaks” where grade changes meet. Doubtful the transitions will be noticeable in the final product but at least I will know they are there! The final results:

grade into KitzmillerThe steepest grade is where the railroad climbs along the Potomac River and then up out of the valley. Squarely in center view as you walk into the train room. It should make for a visually pleasing site watching long trains labor up the hill. Well, at least pretend laboring. An HO scale locomotive can easily haul a 16 car train up a 2% grade. But we can imagine, can’t we? 🙂

Here are a few pics of the work. Enjoy and thanks again for following along. I should note the pictures in the first gallery were taken when I first began the grading. By the time it was finished the little note cards were chock full of scribbled measurements. And I also finished installing the sub-roadbed that circles around the engine service area so I tossed those pics in as well.

Setting the grade

Risers measured, constructed, in place, and glued

Finished compensated grade sub-roadbed

 