Module #13

Written By: Alan - May• 10•16

At long lastmodule 13 I have reached a very major milestone on the LK&O build. Module 13, the last upper deck module, is complete. About time, right? It took me almost a year and a half to build the 13 modules required for one deck! I never laid claim to being speedy. 🙂

DSC_0639

You may be thinking “Hey, what gives? Why no picture of the module installed on the benchwork like you have always done in the past?” There is a reason. Before module 13 is placed in its final position I am taking the opportunity to prepare the area for modeling the Potomac River. The work will be much easier with the module out of the way. Here is a quick snapshot of work in progress on the riverbed. More about it in a later post.

DSC_0121

If you read the previous post you know I was delayed a bit on this module because I ran out of occupancy detector circuits. That won’t happen again. I set up the circuit board assembly line and made a big ole pile of them. Enough to get me through the two helices and the lower deck with spares left over.

DSC_0645

As you can see, module 13 consumed seven of them already.

DSC_0619

Here’s another view that looks kinda cool. Also illustrates how crowded it became as more and more wires were run. Even had to do a little after-the-fact notching of the risers for sufficient wire raceway space.

DSC_0631

Check out the load center grounding bar used as a power point in the above photo. It is on the positive rail from the circuit breaker. Previously, I had used grounding bars only on the negative rail. The occupancy detectors are constructed to allow daisy chaining of the power supply leads but I wasn’t comfortable chaining seven of them in a row. That’s a lot of connections for power to go through by the time it makes it to the last detector. Hence the use of a grounding bar. It made for a lot less connections in the circuits. I did the same on the ground side.

DSC_0628

Wood isn’t a bad insulator but it isn’t a great one either. If the humidity is high there could be a little current leakage across the two bars. To prevent that possibility I made the positive bar insulated from the wood. A piece of cellophane packing tape is on the bottom of the bar, square polystyrene tubing is around the mounting screw threads, and rubber grommets are under the screw heads. Presto! An insulated bar.

insulators

There is only one switch machine on module 13 so control wiring was easy.

DSC_0627

Even though there are seven detection blocks, like the switch machine there is only one circuit breaker on module 13. Five wires and done.

DSC_0622

Looking now at the picture I realize I messed up. That orange/white track bus wire pair for DT28 should have been routed through the nylon clamp with the rest of the wires. Oh well, I won’t lose sleep over it. It is solid 12 gauge wire so it’s not like it is going to fall down. 😉

Here is a photo of final testing. Notice the bench is clean? That’s a sign I am done building modules for a while.

DSC_0635

Once the riverbed work is finished and module 13 fixed in place, I begin fascia and control panel construction. That will be a nice change of pace.

I have to tell you I am excited. With the completion of just a little more work I will be able to run my first train all the way from the yard at Brittain to the tunnel at Kitzmiller. That will be a fun day.