LK&O

A Railroad with Relevance

Module #5 Complete

Written By: Alan - Nov• 08•15

With missing ties installed and a coat of module 5camo brown Module 5 is finished and back on the layout. Hoisting this very long module into place without damaging anything on the underside was quite a challenge. It was heavy, awkward, long, and generally just a PIA. But thanks to help from my wife it is in place with no harm done. Connector #4 is on the bench ready to be built.

100_7649

100_7664

Share